Recommend
Remove File
Remove document <span id="remove-document-name"></span> from <span id="remove-cart-name"></span>?
As large urban areas deal with traffic congestion, space constraints, and air pollution, they will increasingly turn to “green” electric mass transit systems. Conductor rails for LRTs ( light rail transit), monorails, and APMs ( automated people movers) must be reliable, long-wearing, and energy efficient, while needing minimal maintenance. Transit operators demand the optimal conductor bar profiles and layouts to meet specific system operating requirements. They need engineering services, installation assistance, and commissioning oversight. Over time, steel 3rd rail systems will convert to highly conductive stainless steel capped aluminum rails to reduce energy consumption, lower installation costs, and minimize the number of power substations. These “green” rails must provide operating life equivalent to all-steel rails. Innovative PRT (Personal Rapid Transit) concepts need ingenious conductor rail solutions and technically advanced battery charging systems. Lastly, train operators need power and safe plug-in for vehicles parked in maintenance facilities.
For over six decades, Conductix-Wampfler has built a reputation as the global supplier of choice for “green”, energy efficient aluminum/stainless conductor rail solutions, contactless charging systems, and train plug-in power solutions. We have the engineering know-how, practical experience, and testing capabilities to be a partner in your success! We offer:
Conductor Rail Systems
Rail Testing
Stinger Systems – reduce the hazards associated with live plugging of parked trains
Application
Transfer between the "MGM-Hotels" and the Casinos "Monte Carlo" and "Bellagio" in Las Vegas [cable liner system | DCC]
Country
USA
City
Las Vegas
Representative office
Conductix-Wampfler AG [D]
Operator
Doppelmayr [DCC]
Customer
Siemens, Austria
Technical requirement[s]
Electrification of the interior equipment of the People Mover
Product[s]
Conductor Rail, Program 0812 SinglePowerLine
Number of [Load]
2
Travel distance [Load]
2 x 650 m
Travel speed [Load]
37,8 km/h
Number of poles
3 + PE
Collector assembly
Double collector
Current
150 A
Voltage
480 V [AC]
Additional information